A packaging cell simulated in enough detail to run real IEC 61131-3 control against it, which is what virtual commissioning means: the PLC program is the thing under test, and the plant is a model it drives.
It has been run. The Structured Text is compiled and executed on a CODESYS SoftPLC, driving the plant live over Modbus TCP, and the safety behaviour was forced by hand rather than argued for. Screenshots of the running cell are below. This README describes what exists, not what is planned.
| 299 | tests, 100% statement and branch coverage, gated in CI |
| 5 → 14 → 28 | hazards to requirements to the tests that verify them, gated in both directions |
| 62.5% | baseline OEE, against 55.0% with a guard interruption and 46.5% with a starved infeed |
PLC program, Structured Text the thing under test
| process image over Modbus TCP
v
plant simulation, Python deterministic, exhaustively tested
|
+-- OPC UA server supervisory interface
| +-- PackTags the machine's own view of itself
| +-- ISA-95 hierarchy where the machine SITS, and its KPIs
+-- safety channel imports the protection layer from P2
The split matters. The PLC runs on a vendor runtime under Windows; everything below it is Python and runs anywhere. That is also how a real virtual commissioning rig is arranged, with the controller on its own runtime and the plant model elsewhere.
Picking this up after a break, or on Windows? Start with
docs/RESUME_HERE.md.
The PLC never sees the plant. It sees a snapshot taken at the scan boundary, so an input that changes during stages 2 to 5 is not an input change until the next stage 1. That single property is what makes the timing deterministic and reproducible, and it is the thing a reader most often skims past in a paragraph.
Seventeen states and two different kinds of transition. Solid arrows are
commands somebody sends; dashed arrows are the machine reporting its own work
complete. Conflating the two is the usual way to get PackML wrong, and there
is deliberately no "state complete" command anywhere in vpc.packml.
Both diagrams are generated from the code they describe, by
scripts/render_diagrams.py, and CI redraws them and fails on a diff. That is
the same rule the traceability matrix already lives under, for a stronger
reason: a stale number in a README at least gets read, while nobody diffs a
picture, so a diagram that quietly stopped matching the state machine would go
on looking authoritative indefinitely. Tracing the diagram from the standard
instead would have produced a picture of the standard, which proves nothing
about this code.
The controller needs a vendor runtime and those are Windows only to author, so
the project splits: plant, state model and tests are developed and verified on
Linux, the controller runs on Windows. That is how a virtual commissioning rig
is normally arranged anyway. docs/WINDOWS_SETUP.md is the sequence that was
followed, and plc/codesys/cell.project is generated by
plc/codesys/build_project.py driving the CODESYS scripting engine, so the
project file is reproducible rather than a hand-built artefact nobody can rebuild.
PackML state 6, Execute. The program is on the SoftPLC and the plant is being driven over Modbus TCP.
The same cell moments after the plant process was killed. The heartbeat stopped advancing, the link watchdog fired, PackML went to state 9 Aborted and every actuator dropped. SR-06 and SR-07 forced by hand, not argued for.
The Modbus client channels, each cyclic at 20 ms against the plant's 50 ms scan, so the controller never reads a half-updated image.
The process image mapped bit by bit onto the PLC's variables. The address map
is generated from one enum in src/vpc/process_image.py, so the two halves
cannot disagree.
src/vpc/packml.py implements the PackML state model from ISA-TR88.00.02:
seventeen states, the acting and wait distinction, and the state complete
transition that belongs to the machine rather than to any operator.
It is in Python first, deliberately. PackML belongs in the PLC and is
written in Structured Text, but that ST could not be executed on the Linux
machine the model was developed on, and a seventeen state machine with a partial
transition function is exactly the kind of thing that looks correct and is not.
So the model was built and verified here, exhaustively, and the ST was written
to match it. This module is the executable specification; the ST is an
implementation of it, and tests/test_st_matches_the_model.py parses the ST and
checks that it still is. That test earned itself on its first run: the program
declared its power on state as 4 with a comment saying Aborted, and 4 is Idle.
A controller powering up Idle is one command away from running a machine
nobody has reset.
The tests enumerate rather than sample:
- every state is reachable from power on, by breadth first search over commands and state complete, not by walking paths the author had in mind
- Execute is reachable from every state, so the cell can never enter something it cannot productively leave
- Abort is reachable from every state that is not already going there, since a safety path one state cannot reach is not a safety path
- every one of the 17 x 9 state and command combinations either transitions or raises, so a command an operator believed was accepted is never silently swallowed
- Abort outranks Stop, checked because transposing them means a machine that politely decelerates when somebody hit the emergency button
src/vpc/process_image.py is the contract between the two halves: the
address map, held once, from which the PLC side declarations are generated. Two
copies of an address map is one copy plus a future defect.
It also carries the reason the whole thing is scan based rather than event driven. A real PLC copies every input into a buffer, runs the program against that frozen snapshot, then writes every output at once, so a signal that changes twice in a scan is seen once and nothing the program writes takes effect until the scan ends. Those are the semantics people get wrong moving from software to control, and a callback based simulation would hide them.
src/vpc/cell.py is the plant: a conveyor with a filler, a capper and a QC
reject, advanced one scan at a time and never by a clock. Deterministic, so a
scenario replays exactly. The one part modelled carefully is the safety chain,
because it is the part with a wrong answer that hurts somebody: torque is the
safety channel's to give, not the program's to take, and closing a guard does
not by itself restore it.
plc/cell_control.st is the program under test, written to plain IEC 61131-3.
tests/test_st_matches_the_model.py parses it and checks its transition table
against the verified Python model, because the ST cannot be executed here. That
test earned itself immediately: the program declared its power on state as 4,
with a comment saying Aborted, and 4 is Idle. A controller powering up Idle is
one command away from running a machine nobody reset.
src/vpc/modbus.py is Modbus TCP, implemented rather than imported. Every
function in it goes from bytes to bytes with no socket anywhere, which is what
makes the wiring layer exhaustively testable: every function code, every
exception path, every boundary, every malformed frame, and every split point of
a frame arriving one byte at a time. Modbus TCP is small, and a dependency whose
API moves between minor versions is a worse bet than 200 lines that do not.
src/vpc/server.py is the bridge, and it is the reason everything above is
shaped the way it is. The PLC is the client and the plant is the server, which
is not arbitrary: the PLC writes coils and reads discrete inputs and input
registers, and those directions are what the Modbus address spaces mean. To a
controller this simulation is a remote IO drop that happens to think.
It runs in one thread, on a selector whose timeout expires at the next scan boundary. A socket thread plus a scan thread plus a lock would fix the race and still be wrong, because a lock lets a coil write land in the middle of a scan and the entire point of a process image is that it cannot. So network writes land in a staged image that the plant sees only at the boundary:
A controller that sets
CONVEYOR_RUNand takes it back within one scan period has, from the plant's point of view, done nothing at all.
That is what happens on a real machine, and it is a class of bug a callback
simulation makes invisible. tests/test_server.py pins it, along with the
control case, because a boundary test passes trivially on a server that ignores
writes entirely.
Verified against pymodbus as well as its own tests, since a server checked only by the client that shares its assumptions proves self-consistency rather than a wire format.
PackTags answers what is this machine doing. It does not answer which
machine, and on a real site that is the harder question. A flat address space
works for exactly one machine; the second arrives with a StateCurrent of its
own, the two collide, and every supervisor above them grows a per-machine
translation layer, which is the thing PackTags existed to remove.
src/vpc/isa95.py makes the equipment address structural, so a work unit is
identified by where it sits:
Enterprise/Site/Packaging/BottlingLine1/PackagingCell
+-- Infeed Filler Capper
+-- QCStation Outfeed
Browse to that path over OPC UA and the work unit carries MachineState,
UnitMode, StopReason, the counts, the ISO 22400 KPIs (availability,
performance, quality, OEE), a measured CycleTime, the recipe and the active
alarm count. tests/test_opcua_isa95.py walks that path by name at every
level with a real asyncua client over the encrypted channel, because being
handed the node would let a broken hierarchy pass.
Three things are deliberate and worth arguing with:
- The levels are IEC 62264-1, which defines Enterprise, Site, Area, Work
Center and Work Unit. "Production Line" and "Work Cell" are specialisations of
the last two, not levels.
EquipmentModuleis ISA-88, borrowed on purpose and labelled as such, because the filler and the capper are real addressable things and pretending otherwise would be a worse model than crossing a standard boundary and saying so. - OEE is ISO 22400, not ISA-95. It is routinely called an ISA-95 KPI and is not one. ISA-95 gives the hierarchy the KPIs hang on.
- Only the work unit carries variables. A Site has no
MachineState, and inventing one invites a supervisor to aggregate across a level that never populated it.
Two smaller decisions that a supervisor would otherwise trip on: a line that
produced nothing publishes CycleTime of -1.0 rather than 0.0, because OPC
UA has no null for a Double and zero trends as an infinitely fast line; and
nothing in the set is writable, because a supervisor able to set OEE could
report a line healthy that is not.
The hierarchy is not decoration. A supervisor written against this address space works unchanged against a site with four lines, which is the claim the flat tag list could not make.
Demonstrated on the running cell, not argued from the model. With the controller producing, the plant process was killed:
PMLState 6 Execute -> 9 Aborted
every coil FALSE
Plant device fault
Then the plant was restarted, and nothing was touched in the IDE:
master reconnected 127.0.0.1 -> 502 Established
SCAN_COUNT 488 -> 548 the plant is alive again
PRODUCED 0 -> 0 the machine is not
The cell recovers the connection automatically and refuses to recover the machine automatically.
Both halves are deliberate. A dropped TCP connection is an infrastructure event, and a controller that needs a human to reconnect a socket is useless, so the Modbus client reconnects on its own. But something happened that the controller could not see, and the only correct response to that is to stop and wait for a person who can. So the cell sits in Aborted needing a deliberate Clear, Reset and Start, exactly as it would after a guard opening.
Three defects were found by running the cell that the suite of the time did not catch, and they are worth naming because each is a class rather than a typo:
- The plant died when the master reset the connection. The graceful disconnect was handled and the abrupt one was not, which is backwards: a rig's normal condition is a controller being downloaded to repeatedly, and every one of those ends in a logout.
- The master never reconnected.
AutoReconnectdefaults off, so losing the plant once meant a full download to get it back. - Commands latched. A command written into a state that ignores it was never cleared, so it fired the next time the machine entered a state that wanted it. The cell was one Stop away from resetting itself.
report/oee.md, regenerated and diffed in CI. Each run isolates a single loss,
so the difference against the baseline is attributable to one cause.
| Scenario | Availability | Performance | Quality | OEE |
|---|---|---|---|---|
| baseline | 98.5% | 73.6% | 86.2% | 62.5% |
| guard interruption | 86.8% | 73.7% | 85.9% | 55.0% |
| starved infeed | 98.5% | 54.8% | 86.1% | 46.5% |
The shape of the loss is the finding, not the size of it. A guard opening costs availability: the cell is fine, it is not allowed to run, and the restart is a deliberate act nobody can skip. A starved infeed costs performance: the cell is running perfectly and producing nothing, and a single availability figure would have called that a good hour. The remedies are completely different, one is a procedure and the other is a supplier, and a plant manager looking at one number cannot tell them apart.
Two definitions are stated in the report because OEE is easy to flatter. Performance uses total count, not good count, so a fast line making scrap cannot hide inside it. Quality puts the ejected bottles in the denominator: they occupied the stations and consumed the cycle, and leaving them out would credit the cell with capacity it spent producing waste. The ideal cycle time is derived from the slowest station rather than chosen, which is the other place an OEE figure usually goes soft.
Scenarios run against ReferenceController, which is not a second controller.
It is the executable specification of the policy plc/cell_control.st
implements, and tests/test_st_matches_the_model.py parses the ST and compares
its four output expressions against it, so the two cannot drift.
- Siemens S7 or PLCSIM Advanced interoperability, after the information model. The model is what makes a second PLC vendor interesting rather than repetitive.
- A Wireshark capture of a live CODESYS exchange — makes the protocol concrete rather than asserted. Needs the vendor runtime, so it is the one item that cannot be done headlessly.
- Donate the OPC UA hardening to the other repos.
opcua.pyis the only correct implementation in the portfolio. The immediate half is already handled, sincemoveit-ur5-pick-placenow refuses anonymous clients; what is left is extracting a shared helper so the fourth repo does not repeat it, and that is a portfolio-wide packaging change rather than work on this one.
Already done, recorded here because it was on an earlier list. Property-testing the register map: tests/test_modbus_properties.py checks parsing, framing, round-trips and, most usefully, that no coil write at any of the 65,536 addresses can reach a discrete input, over the whole space rather than at the address somebody thought to try. tests/test_st_matches_the_model.py asserts the ST declarations are byte-identical to the generated address map, so the PLC side cannot drift from the Python side. A test guards against the file silently becoming decoration.
uv run --group dev pytest -qExpect 299 passed. 100% statement and branch coverage is gated, along with
ruff and mypy --strict.
To run the plant for a controller to connect to, default port 502:
uv run python -m vpc.serverThen bring the control program up against it. docs/WINDOWS_SETUP.md has the
full sequence, including a table of state transitions that can be forced from
the IDE watch window to verify the program before wiring any IO. That check
needs no plant and no network, and it is the cheapest confidence available.
To regenerate the CODESYS project rather than opening the committed one:
python plc/codesys/build_project.pyScenario runs and the traceability matrix regenerate into report/:
uv run python scripts/run_scenarios.py
uv run python scripts/check_traceability.pyBoth are generated files. Editing report/oee.md or report/traceability.md by
hand defeats the point of having them.