Skip to content

chore(deps): update dependency entireio/cli to v0.7.3#202

Merged
pjbgf merged 1 commit into
mainfrom
renovate/entireio-cli-0.x
Jun 4, 2026
Merged

chore(deps): update dependency entireio/cli to v0.7.3#202
pjbgf merged 1 commit into
mainfrom
renovate/entireio-cli-0.x

Conversation

@qubesome-renovate
Copy link
Copy Markdown
Contributor

This PR contains the following updates:

Package Update Change
entireio/cli minor v0.6.3v0.7.3

Release Notes

entireio/cli (entireio/cli)

v0.7.3

Compare Source

Fixed
  • Fixed a bug where internal API calls didn't follow a redirect properly (#​1327)

v0.7.2

Compare Source

Fixed
  • macOS release binaries are Developer ID signed and notarized again. Adding the git-remote-entire binary in 0.7.0 gave the release builds explicit ids that no longer matched the notarization step's default filter, so 0.7.0 shipped ad-hoc-signed binaries that macOS Gatekeeper refused to run — surfacing as Homebrew shell-completion errors and killed on launch (#​1324)
Housekeeping
  • The release workflow now fails closed when any macOS binary is not Developer ID signed, so an un-notarized build can no longer ship silently (#​1324)

v0.7.0

Compare Source

Added
  • The git-remote-entire remote helper now ships inside the CLI and activates from a shared contexts.json login, so entire:// remotes work without a separately installed helper (#​1306)
  • Control-plane CLI backed by a generated Core API client — manage orgs, projects, repos, grants, and mirrors directly from entire (work in progress) (#​1299)
  • Checkpoints v1.1 (work in progress): committed checkpoints can be mirrored to a v1 custom ref (opt-in, local-only), with v1.1 write support and entire explain reading the new format (#​1300, #​1315, #​1311)
  • entire investigate labs command: an experimental multi-agent investigation loop (#​1231)
  • Skill event metadata is now captured for Claude and Pi (#​1292)
Changed
  • entire login is simpler — dropped the clipboard copy and code-entry prompt added in 0.6.3 (#​1322)
  • Internal auth rework spanning auth contexts, cluster trust, and the control-plane client: simplified contexts (removed the cluster-binding model and command surface, "login server" wording, clear current_context on delete), hardened cluster trust with ephemeral binding and a HostInCluster specificity floor, auto-select v2 auth on split-host, routed status/list/revoke/logout through TokenForResource, pinned the AuthBaseURL default, added a control-plane client keyring deadline, and raised the dial timeout 500ms → 2s (#​1318, #​1319, #​1309, #​1290, #​1258, #​1297, #​1307, #​1317)
  • Checkpoints v1 restored as the source of truth — the v2 dual-read path was removed (#​1285)
  • Pi model is now backfilled into checkpoint metadata from the transcript (#​1298)
Fixed
  • entire install points Windows users at Scoop instead of failing (#​1289)
  • Checkpoint commits reachable only through relative alternates (shared clones) are now resolvable by go-git (#​1288)
  • entire trail preserves the forge identifier from entire:// remote URLs (#​1286)
  • Checkpoint git subprocesses are bounded to their context deadline, so a hung git call can't wedge a hook (#​1282)
  • The CLI no longer reports an unknown revision after a go install upgrade (#​1273)
  • Local-dev builds fall back to the PATH binary when the local build is broken (#​1274)
  • Mirror connection reuse: the probe body is now drained before close so the idle connection pool actually works (#​1320)
Housekeeping
  • Per-phase perf spans added to checkpoint pre-push (#​1281)
  • Removed dead code and deduped redundant review/strategy tests (#​1303, #​1302, #​1301)
  • Trimmed the CLAUDE.md file, added the current Pi extension config, and ship the git-remote-entire helper during mise run dev:publish (#​1295, #​1314, #​1308)
  • Dependency bumps: go-dependencies group, goreleaser/goreleaser-action 7.2.1 → 7.2.2 (#​1293, #​1227)

Configuration

📅 Schedule: Branch creation - At any time (no schedule defined), Automerge - At any time (no schedule defined).

🚦 Automerge: Disabled by config. Please merge this manually once you are satisfied.

Rebasing: Whenever PR is behind base branch, or you tick the rebase/retry checkbox.

🔕 Ignore: Close this PR and you won't be reminded about this update again.


  • If you want to rebase/retry this PR, check this box

This PR has been generated by Renovate Bot.

@pjbgf pjbgf merged commit b66ee1a into main Jun 4, 2026
4 checks passed
@pjbgf pjbgf deleted the renovate/entireio-cli-0.x branch June 4, 2026 15:20
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant