Phase 1: establish Rev A hardware contract and PCB - #5
Draft
danielbrownjr wants to merge 2 commits into
Draft
Conversation
This file contains hidden or bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Add this suggestion to a batch that can be applied as a single commit.This suggestion is invalid because no changes were made to the code.Suggestions cannot be applied while the pull request is closed.Suggestions cannot be applied while viewing a subset of changes.Only one suggestion per line can be applied in a batch.Add this suggestion to a batch that can be applied as a single commit.Applying suggestions on deleted lines is not supported.You must change the existing code in this line in order to create a valid suggestion.Outdated suggestions cannot be applied.This suggestion has been applied or marked resolved.Suggestions cannot be applied from pending reviews.Suggestions cannot be applied on multi-line comments.Suggestions cannot be applied while the pull request is queued to merge.Suggestion cannot be applied right now. Please check back later.
Summary
This draft PR tracks Jump Jet Phase 1 hardware definition and first Rev A PCB implementation.
It is intentionally opened before the PCB is complete so schematic corrections, mechanical decisions, footprint work, component selections, layout rationale, and validation evidence can accumulate in one reviewable place.
This PR is NOT fabrication-ready and does NOT authorize heater or fan actuation.
The current production firmware remains cold-safe and heater-incapable.
Current Phase 1 status
Completed / established:
Current important design directions
Heater path
Current Rev A.4.1 topology:
+24V_PROT
-> F2
-> TF1
-> TS1
-> J2
-> external CZ4060 heater
-> Q1
-> GND
The heater path is sized using the conservative 8.33 A basis until full production-intent validation proves otherwise.
ESP32-S3 mounting
Current physical measurements:
Production direction:
ESP32 power
Preferred architecture:
protected 24 V
-> onboard regulator
-> +5V_SYS/GATE
-> isolated or source-selected +5V_MCU
-> ESP32-S3 Super Mini
USB-C is retained for:
USB-C is not intended as the normal installed power source.
Mixed-source and backfeed behavior must be physically verified before freeze.
Fan architecture
The original Rev A.4.1 two-wire low-side-switched fan block is obsolete for the intended replacement fan.
Current direction:
Gate drive
Rev A.4.1 currently uses SN74AHCT125 buffering with used OE inputs tied low.
Required correction:
Current fabrication blockers
The first Rev A PCB must not be released for fabrication until the following are sufficiently closed:
Phase 1 review checklist
Mechanical / footprint
Power / protection
Heater path
Fan
PCB
Safety boundary
Nothing in this PR should be interpreted as authorization for heater actuation.
Firmware remains cold-safe until the hardware path, sensing, fan proof, safety interlocks, and physical protections are implemented and validated.
Firmware does not replace:
Source of truth
Primary Phase 1 tracking documents:
The hardware register is the living record of confirmed facts, measurements, design decisions, candidates, assumptions, and blockers.
Merge criteria
Do not merge this PR merely because the first PCB exists.
Phase 1 should only be considered merge-ready after: