Skip to content
Merged
Show file tree
Hide file tree
Changes from all commits
Commits
File filter

Filter by extension

Filter by extension


Conversations
Failed to load comments.
Loading
Jump to
Jump to file
Failed to load files.
Loading
Diff view
Diff view
25 changes: 0 additions & 25 deletions .github/workflows/appdir-jekyll-update.yml

This file was deleted.

2 changes: 1 addition & 1 deletion .github/workflows/codecov.yml
Original file line number Diff line number Diff line change
Expand Up @@ -12,7 +12,7 @@ on:
jobs:
test-and-codecov:
name: "🤙 Call SDK test workflow"
uses: clamsproject/.github/.github/workflows/sdk-codecov.yml@main
uses: clamsproject/.github/.github/workflows/sdk-codecov-pyproj.yml@main
secrets:
CC_REPO_UPLOAD_TOKEN: ${{ secrets.CODECOV_UPLOAD_TOKEN_CLAMS_PYTHON }}

2 changes: 1 addition & 1 deletion .github/workflows/container.yml
Original file line number Diff line number Diff line change
Expand Up @@ -59,7 +59,7 @@ jobs:
echo "slug=${slug}" >> $GITHUB_OUTPUT
- name: "🛍️ Checkout repository"
uses: actions/checkout@v4
uses: actions/checkout@v5
with:
ref: ${{ inputs.ref || inputs.version }}

Expand Down
2 changes: 1 addition & 1 deletion .github/workflows/containers.yml
Original file line number Diff line number Diff line change
Expand Up @@ -39,7 +39,7 @@ jobs:
- name: "⏱️ Wait up to 20 minutes for the new clams-python is deployed on PyPI"
uses: nev7n/wait_for_response@v1
with:
url: "https://pypi.org/project/clams-python/${{ needs.set-version.outputs.version }}/"
url: "https://pypi.org/pypi/clams-python/${{ needs.set-version.outputs.version }}/json"
responseCode: 200
timeout: 1200000
interval: 5000
Expand Down
5 changes: 1 addition & 4 deletions .github/workflows/publish.yml
Original file line number Diff line number Diff line change
Expand Up @@ -36,7 +36,7 @@ jobs:
name: "📦 Build and upload to PyPI"
needs: check-pypi
if: needs.check-pypi.outputs.exists == 'false'
uses: clamsproject/.github/.github/workflows/sdk-publish.yml@main
uses: clamsproject/.github/.github/workflows/sdk-publish-pyproj.yml@main
secrets: inherit

publish-docs:
Expand All @@ -48,7 +48,4 @@ jobs:
source_repo: clamsproject/clams-python
source_ref: ${{ needs.check-pypi.outputs.version }}
project_name: clams-python
build_command: 'python3 build-tools/docs.py --output-dir docs'
docs_output_dir: 'docs'
python_version: '3.11'
secrets: inherit
4 changes: 3 additions & 1 deletion .gitignore
Original file line number Diff line number Diff line change
Expand Up @@ -4,7 +4,6 @@

# build time temp files
VERSION*
clams/ver

# linux
.*.sw?
Expand Down Expand Up @@ -67,6 +66,7 @@ hs_err_pid* # virtual machine crash logs, see http://www.java.com/en/download/he
build/
dist/
*.egg-info
clams_python-*/
coverage.xml

# shared folders
Expand All @@ -84,3 +84,5 @@ tags

# sphinx
docs-test/
documentation/appmetadata.jsonschema
documentation/whatsnew.md
91 changes: 91 additions & 0 deletions CONTRIBUTING.md
Original file line number Diff line number Diff line change
@@ -0,0 +1,91 @@
# Contributing to clams-python

## Prerequisites

- Python 3.10+
- `gh` CLI (for changelog generation)

## Setup

```bash
pip install -e ".[dev]"
```

Unlike the old `setup.py`-based workflow, an editable install
(`pip install -e .`) is now required before running tests or building
docs. The package uses `importlib.metadata` for version resolution at
runtime, which only works when the package is registered in the
environment. You can no longer run `pytest` or `pytype` directly
against the source tree without installing first. If you want to avoid
pulling in all dependencies, `pip install -e . --no-deps` is sufficient
to register the package metadata.

## Local Development

All build tasks are handled by scripts in `build-tools/`. Each script
is self-contained and installs its own dependencies as needed.

| Task | Command |
|------|---------|
| Build (sdist + wheel) | `python build-tools/build.py` |
| Run tests | `python build-tools/test.py` |
| Build docs | `python build-tools/docs.py` |
| Clean artifacts | `python build-tools/clean.py` |
| Publish | `python build-tools/publish.py` |

All scripts support `--help` for full usage details.

### Build

```bash
python build-tools/build.py
```

Produces sdist and wheel in `dist/`.

### Test

```bash
python build-tools/test.py
```

Runs pytest with coverage. Use `--skip-install` if you already have the
package installed in editable mode.

### Documentation

```bash
python build-tools/docs.py
```

Builds Sphinx HTML docs into `docs-test/` (override with `--output-dir`).
The `--build-ver` flag is accepted for CI compatibility but has no effect
— clams-python uses unversioned documentation.

### Versioning

Versions are derived automatically from git tags via `setuptools-scm`.
There is no `VERSION` file to manage. At runtime, the version is
accessed through `importlib.metadata`:

```python
from clams.ver import __version__
```

For a dev install without a matching tag, `setuptools-scm` generates a
version like `1.4.1.dev20+gaf551a4e4.d20260325`.

## Migration from Makefile

The old `Makefile` and `setup.py` have been removed. If you are
accustomed to the old workflow, here is a mapping:

| Old command | New equivalent |
|-------------|----------------|
| `make package` / `python setup.py sdist` | `python build-tools/build.py` |
| `make develop` / `python setup.py develop` | `pip install -e ".[dev]"` |
| `make test` | `python build-tools/test.py` |
| `make doc` | `python build-tools/docs.py` |
| `make version` / `make devversion` | Automatic via `setuptools-scm` (tag-based) |
| `make clean` | `python build-tools/clean.py` |
| `make publish` | `python build-tools/publish.py` |
3 changes: 0 additions & 3 deletions MANIFEST.in

This file was deleted.

102 changes: 0 additions & 102 deletions Makefile

This file was deleted.

54 changes: 54 additions & 0 deletions build-tools/build.py
Original file line number Diff line number Diff line change
@@ -0,0 +1,54 @@
"""
Build the clams-python package.

Installs dependencies and runs `python -m build` to produce sdist + wheel.
"""
import argparse
import subprocess
import sys
from pathlib import Path

SCRIPT_DIR = Path(__file__).parent


def run_command(command, cwd=None, check=True):
"""Helper to run a shell command."""
print(f"Running: {' '.join(str(c) for c in command)}")
result = subprocess.run(command, cwd=cwd)
if check and result.returncode != 0:
print(
f"Error: Command failed with exit code "
f"{result.returncode}"
)
sys.exit(result.returncode)
return result


def main():
parser = argparse.ArgumentParser(
description="Build the clams-python package."
)
parser.parse_args()

project_root = SCRIPT_DIR.parent

# Install dev + build dependencies
print("--- Installing dependencies ---")
run_command(
[sys.executable, "-m", "pip",
"install", "-e", ".[dev]", "build"],
cwd=project_root,
)

# Build sdist + wheel
print("\n--- Building sdist + wheel ---")
run_command(
[sys.executable, "-m", "build"],
cwd=project_root,
)

print("\nBuild complete. Output in: dist/")


if __name__ == "__main__":
main()
Loading
Loading