Skip to content

v1.21.1: patch release notes - #2216

Open
wallrj wants to merge 1 commit into
cert-manager:masterfrom
wallrj:release-notes-v1.21.1
Open

v1.21.1: patch release notes#2216
wallrj wants to merge 1 commit into
cert-manager:masterfrom
wallrj:release-notes-v1.21.1

Conversation

@wallrj

@wallrj wallrj commented Jul 29, 2026

Copy link
Copy Markdown
Member

Preview:

Summary

  • Add v1.21.1 release notes to release-notes-1.21.md, generated with the WIP release-notes generator from Add release-notes generator script and Makefile target #1785, plus a hand-written summary and the security dependency bumps
  • Bump cert_manager_latest_version to v1.21.1 in variables.json
  • Corrected the four cherry-picked Bug or Regression entries to credit the original PR authors (@sklirg, @SebTardif, @wallrj-cyberark, @mateenali66) instead of @cert-manager-bot, which merged the backport PRs on release-1.21

Motivation

Part of the cert-manager v1.21.1 release process.

Test plan

  • Netlify deploy preview renders correctly
  • Release notes page shows the v1.21.1 section including security dependency bumps
  • Spellcheck passes
  • cert_manager_latest_version renders v1.21.1 on the installation docs

@cert-manager-prow cert-manager-prow Bot added the dco-signoff: yes Indicates that all commits in the pull request have the valid DCO sign-off message. label Jul 29, 2026
@cert-manager-prow

Copy link
Copy Markdown
Contributor

[APPROVALNOTIFIER] This PR is NOT APPROVED

This pull-request has been approved by:
Once this PR has been reviewed and has the lgtm label, please assign munnerz for approval. For more information see the Code Review Process.

The full list of commands accepted by this bot can be found here.

Details Needs approval from an approver in each of these files:

Approvers can indicate their approval by writing /approve in a comment
Approvers can cancel approval by writing /approve cancel in a comment

@cert-manager-prow cert-manager-prow Bot added the size/M Denotes a PR that changes 30-99 lines, ignoring generated files. label Jul 29, 2026
@wallrj

wallrj commented Jul 29, 2026

Copy link
Copy Markdown
Member Author

/hold until v1.21.1 is published

@cert-manager-prow cert-manager-prow Bot added the do-not-merge/hold Indicates that a PR should not merge because someone has issued a /hold command. label Jul 29, 2026
@netlify

netlify Bot commented Jul 29, 2026

Copy link
Copy Markdown

Deploy Preview for cert-manager ready!

Built without sensitive environment variables

Name Link
🔨 Latest commit 0fa17c9
🔍 Latest deploy log https://app.netlify.com/projects/cert-manager/deploys/6a6a1e8708c0e300082f69dc
😎 Deploy Preview https://deploy-preview-2216--cert-manager.netlify.app
📱 Preview on mobile
Toggle QR Code...

QR Code

Use your smartphone camera to open QR code link.

To edit notification comments on pull requests, go to your Netlify project configuration.

@wallrj-cyberark
wallrj-cyberark force-pushed the release-notes-v1.21.1 branch from 285f457 to 0b2f790 Compare July 29, 2026 15:30
Signed-off-by: Richard Wall <richard.wall@cyberark.com>
@wallrj-cyberark

Copy link
Copy Markdown
Member

/unhold

@cert-manager-prow cert-manager-prow Bot removed the do-not-merge/hold Indicates that a PR should not merge because someone has issued a /hold command. label Jul 29, 2026
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

dco-signoff: yes Indicates that all commits in the pull request have the valid DCO sign-off message. size/M Denotes a PR that changes 30-99 lines, ignoring generated files.

Projects

None yet

Development

Successfully merging this pull request may close these issues.

2 participants