Skip to content

Add Baseline Base MCP plugin#111

Open
ind-igo wants to merge 3 commits into
base:masterfrom
ind-igo:codex/add-baseline-base-mcp-plugin
Open

Add Baseline Base MCP plugin#111
ind-igo wants to merge 3 commits into
base:masterfrom
ind-igo:codex/add-baseline-base-mcp-plugin

Tighten Baseline plugin: validation, artifact links, tags

dd21a56
Select commit
Loading
Failed to load commit list.
StepSecurity Actions Security / StepSecurity Required Checks succeeded Jun 22, 2026 in 0s

StepSecurity Required Checks

Finished StepSecurity Required Checks

  • NPM Compromised Packages Check - Checks for compromised npm package versions in the PR
  • NPM Package Cooldown Check - Fails if any package version in the PR was released within the configured cooldown period, helping to avoid brand-new (and potentially unreviewed or malicious) releases

Details

✅ NPM Compromised Packages Check

No Compromised npm packages are added in current PR.

✅ NPM Package Cooldown Check

No npm package upgrades to recent releases found in current PR.