Skip to content

docs(003): close T066 canonical task truth - #59

Merged
TheHalfMoon merged 1 commit into
mainfrom
docs/003-t066-closeout
Aug 18, 2026
Merged

docs(003): close T066 canonical task truth#59
TheHalfMoon merged 1 commit into
mainfrom
docs/003-t066-closeout

Conversation

@TheHalfMoon

@TheHalfMoon TheHalfMoon commented Aug 18, 2026

Copy link
Copy Markdown
Owner

What changed

Close Spec 003 T066 only in canonical tasks.md after PR #58 merged.

This PR changes exactly one file:

  • specs/003-workspace-execution-spine/tasks.md

It marks T066 complete and records the canonical evidence:

T067, T068, and T069 remain unchecked and not started. This PR does not reinterpret T066 repair reviews as T068 independent-review completion.

Spec Kit traceability

  • Active spec: specs/003-workspace-execution-spine/spec.md
  • Plan/tasks updated if scope changed: [x] Canonical task truth only; no product scope change.
  • Acceptance scenario(s) proven: [x] T066 evidence is already canonical through merged PR fix(winds): repair T066 restart ownership reconciliation #58; this PR only records that truth.

Deterministic evidence

  • cargo fmt --check — pending closeout PR CI where triggered
  • cargo clippy --all-targets -- -D warnings — pending closeout PR CI where triggered
  • cargo test --all-targets — pending closeout PR CI where triggered
  • Slice-specific required checks — pending repository-required closeout checks where triggered

Review stack

Winds safety invariants

  • Primary checkout is not mutated by candidate flows
  • No forced worktree cleanup/deletion
  • Evidence binds to exact candidate state
  • Agent-reported claims are not promoted to observed truth
  • No automatic winner/merge/rebase/push behavior introduced

Findings and exceptions

This is a documentation-only canonical-truth closeout. It does not modify runtime, dependencies, migrations, workflows, verification authority, PTY/ConPTY/WSL behavior, or public protocol surface.

Hard boundary: merge this PR only as T066 closeout. Do not mark, start, or claim T067 Ponytail, T068 independent review, T069 final reconciliation, or Spec 003 completion.


Summary by cubic

Closes Spec 003 task T066 by marking it complete in the canonical checklist and recording the accepted evidence from PR #58. This updates documentation only and does not change runtime or public behavior.

  • Updates specs/003-workspace-execution-spine/tasks.md to check T066 and summarize evidence: quality, windows-terminal, and release-candidate pipelines passed across Ubuntu/macOS/Windows (including WSL2), T063 soak, T064 verification regression, SC-001, packaging, and a clean exact-head merge-gate review with all PR fix(winds): repair T066 restart ownership reconciliation #58 threads resolved.
  • Leaves T067, T068, and T069 unchecked and not started; PR fix(winds): repair T066 restart ownership reconciliation #58 reviews do not satisfy T068.
  • Merge only as T066 closeout; no scope, workflow, dependency, or protocol changes.

Written for commit 382a8e5. Summary will update on new commits.

Review in cubic

@coderabbitai

coderabbitai Bot commented Aug 18, 2026

Copy link
Copy Markdown

Warning

Review limit reached

@TheHalfMoon, you've reached your PR review limit, so we couldn't start this review.

Next review available in: 2 minutes

Limit details: You’ve used all 3 included reviews currently available under your plan.

Enable usage-based reviews in Billing to review now. Otherwise, wait until the next included review is available.
You're only billed for reviews past your plan's rate limits ($0.25/file).

How can I continue?

After more reviews become available, a review can be triggered using the @coderabbitai review command as a PR comment. Alternatively, push new commits to this PR.

To avoid repeated limits, reduce automatic review volume by pausing incremental auto-reviews earlier, using label-based review opt-in, excluding WIP or generated PR titles, or requesting reviews manually when the PR is ready. If your team needs uninterrupted high-volume reviews, an organization admin can enable usage-based reviews.

How do review limits work?

CodeRabbit enforces per-developer PR review limits for each organization. Most developers receive the normal plan review availability.

For paid Pro and Pro+ PR reviews, CodeRabbit uses adaptive limits for sustained high-volume activity. When a developer's recent PR review activity reaches the 95th percentile or higher among CodeRabbit users, additional reviews become available more gradually as earlier reviews age out of the rolling window.

Please refer docs for additional details.

Review details
⚙️ Run configuration

Configuration used: defaults

Review profile: CHILL

Plan: Pro Plus

Run ID: 7c4ab136-15f1-4e5f-a51c-b7f0448fc237

📥 Commits

Reviewing files that changed from the base of the PR and between af89ee6 and 382a8e5.

📒 Files selected for processing (1)
  • specs/003-workspace-execution-spine/tasks.md

Comment @coderabbitai help to get the list of available commands.

@qodo-code-review

Copy link
Copy Markdown

Code Review by Qodo

🐞 Bugs (0) 📘 Rule violations (0) 📎 Requirement gaps (0)

Grey Divider

Great, no issues found!

Qodo reviewed your code and found no material issues that require review

Grey Divider

Tip of the day
💡 Did you know, you can keep summaries lean with Finding overflow, which tucks the rest behind 'View more'

More tips ↗ | Customize Qodo ↗ | Qodo docs ↗

Grey Divider

Qodo Logo

@qodo-code-review

Copy link
Copy Markdown

PR Summary by Qodo

Close Spec 003 T066 with canonical review evidence

📝 Documentation 🕐 Less than 5 minutes

Grey Divider

AI Description

• Marks T066 correctness/safety review complete in the canonical Spec 003 checklist.
• Records exact implementation, CI, platform, review, and merge evidence from PR #58.
• Preserves T067-T069 as unstarted and avoids broader Spec 003 completion claims.
Diagram

graph TD
  A["Accepted Head"] -->|validated by| B["CI and Reviews"] -->|recorded in| C["T066 Complete"] -->|scope boundary| D["T067-T069 Pending"]
Loading
High-Level Assessment

Updating the canonical checklist directly is the optimal approach because the implementation and review work already landed in PR #58. A separate evidence document would duplicate provenance and weaken tasks.md as the source of truth; retaining explicit T067-T069 boundaries prevents accidental over-claiming.

Files changed (1) +2 / -2

Documentation (1) +2 / -2
tasks.mdClose T066 with canonical PR #58 evidence +2/-2

Close T066 with canonical PR #58 evidence

• Marks T066 complete and records the accepted implementation head, CI and platform results, repaired correctness findings, exact-head review outcome, and canonical merge commit. Explicitly leaves T067, T068, and T069 unchecked and disclaims broader Spec 003 completion or runtime scope changes.

specs/003-workspace-execution-spine/tasks.md

@TheHalfMoon
TheHalfMoon merged commit fa1a179 into main Aug 18, 2026
4 checks passed
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant