Skip to content

Milestones

List view

  • Step eight. A reproducible build, a container that produces it, an artifact an operator can serve, and the plan for the domain.

    No due date
    10/14 issues closed
  • Step seven. What the site collects, what it sends, and where personal data goes.

    No due date
    6/10 issues closed
  • Step six. The jellyfin-plugin-sso merge gate as the target, item by item, with a written reason for every deviation.

    No due date
    23/26 issues closed
  • Step five. The budget as numbers a build can miss, accessibility as a gate, and the separate harness for what cannot be judged without a live site.

    No due date
    8/14 issues closed
  • Step four. Landing, install, one page per plugin, the design system, and the checks that keep the links and the markup honest.

    No due date
    22/27 issues closed
  • Step three. One machine-readable roster, read by the build, cross-checked against what is actually published.

    No due date
    7/11 issues closed
  • Step two. Language, toolchain, repository layout, the build verb, the test harness, the rule that every test runs without a display and without elevation, and the checks under the names a ruleset can require.

    No due date
    39/41 issues closed
  • Step one. The questions that shape everything else, answered in writing with their reasons, before any code depends on them.

    No due date
    13/15 issues closed