Skip to content

Working with multiple repositories simultaneously  #65

Description

@Mihailoff

It seems that you can double/triple time report when you work with multiple repositories simultaneously.

Timestamp 1
Repo A: status running
Repo B: status running
Timestamp 2
Repo A: status running
Repo B: status running

So in total you will get duration between Timestamp 1 and 2 for both Repo A and B. In other words 5 minutes of work will result in 10 minutes reported.

This depends on MBU, the lower it is the less overtracking you'll get.

Timeglass version 0.6.0 (20150705144337)

Metadata

Metadata

Assignees

No one assigned

    Labels

    No labels
    No labels

    Type

    No type

    Fields

    No fields configured for issues without a type.

    Projects

    No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions