Skip to content

chore(deps): bump github/codeql-action/init from 4.37.0 to 4.37.3 #148

chore(deps): bump github/codeql-action/init from 4.37.0 to 4.37.3

chore(deps): bump github/codeql-action/init from 4.37.0 to 4.37.3 #148

Triggered via pull request July 24, 2026 10:32
Status Cancelled
Total duration 1m 7s
Artifacts

ci.yml

on: pull_request
Prepare verification matrix
10s
Prepare verification matrix
Matrix: package-compatibility
Matrix: verify
Fit to window
Zoom out
Zoom in

Annotations

10 errors
Package compatibility / Node 18 (sdk-only)
Process completed with exit code 1.
Verify / typecheck
Canceling since a higher priority waiting request for ci-refs/pull/60/merge exists
Verify / lint
Canceling since a higher priority waiting request for ci-refs/pull/60/merge exists
Verify / architecture
Canceling since a higher priority waiting request for ci-refs/pull/60/merge exists
Verify / audit
Canceling since a higher priority waiting request for ci-refs/pull/60/merge exists
Verify / build-webui
Canceling since a higher priority waiting request for ci-refs/pull/60/merge exists
Verify / test
Canceling since a higher priority waiting request for ci-refs/pull/60/merge exists
Verify / test
The operation was canceled.
CI
Canceling since a higher priority waiting request for ci-refs/pull/60/merge exists
Gate
Process completed with exit code 1.