Task (from GOAL.md)
Freeze the v1 stack and surface (LAUNCH_CHECKLIST.md §1) — suggested cut: Next.js 15 + TypeScript + Tailwind + shadcn/ui + Postgres/Prisma + Auth.js
Task index: 0
Milestone: M1 — Bootstrap the v1 application
Acceptance criteria
Confirmed goal
Launch Mission Control as the live marketing-operations hub for Empyrean (target: launch this week)
Gate
NONE (no test framework yet — task includes setting one up)
Task (from GOAL.md)
Freeze the v1 stack and surface (LAUNCH_CHECKLIST.md §1) — suggested cut: Next.js 15 + TypeScript + Tailwind + shadcn/ui + Postgres/Prisma + Auth.js
Task index: 0
Milestone: M1 — Bootstrap the v1 application
Acceptance criteria
scripts/launch/audit.shreports 0 critical gaps and the launch-readiness workflow is green on main.NONE (no test framework yet — task includes setting one up)orch/<issue>-<slug>with a PR titled with the taskConfirmed goal
Launch Mission Control as the live marketing-operations hub for Empyrean (target: launch this week)
Gate
NONE (no test framework yet — task includes setting one up)