Skip to content

feat(split): OSS / Enterprise split [ENDS OSS Base Milestone] ============================================ #398

Description

@matdev83

feat(split): OSS / Enterprise split [ENDS OSS Base Milestone]

Dependency gate

This is the terminal gate for the OSS Base milestone. Keep only top-level prerequisites here; implementation/architecture prerequisites remain transitive through their owning feature/work-order tracker.

Current direct OSS Base prerequisites:

Transitive chains

Large-payload fast path

#532#503#398

Pre-OSS core slimming

The production implementation and runtime verification for #571 are effectively complete through #591:

However, #571 remains a release gate because its canonical Kiro state is not yet closed out: Task 8.4 remains unchecked, spec.json still reports completed: false, and the spec remains in the active spec tree rather than archived. #571 should close only after those required final closeout artifacts truthfully reflect the already-green merged-main evidence.

#545 is likewise a direct terminal prerequisite because #534 introduced the bulk-provider SDD without a separate feature-level parent tracker and explicitly places broad provider expansion before the Open Core release. Do not duplicate individual provider tickets covered by #534 as #398 blockers.

Current ordering notes

Completed prerequisites / baselines

All active dependency relationships described here are intentionally within the OSS Base milestone.

Activity

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    allow-large-changeAllow PRs that change more than 100 files

    Projects

    No projects

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions