The meeting will take place on Monday 2025/05/05 at 8pm UTC (5:30am Adelaide time) on Libera Chat IRC #lightning-dev. It is open to the public.
A video link is available for higher bandwidth communication: https://meet.jit.si/Lightning-Spec-Meeting
Recently Updated Proposals / Seeking Review
This section contains changes that have been opened or updated recently and need feedback from the meeting participants.
Stale Proposals
This section contains pending changes that may not need feedback from the meeting participants, unless someone explicitly asks for it during the meeting. These changes are usually waiting for implementation work to happen to drive more feedback.
Waiting for interop
This section contains changes that have been conceptually ACKed and are waiting for at least two implementations to fully interoperate.
They most likely don't need to be covered during the meeting, unless someone asks for updates.
Long Term Updates
This section contains long-term changes that need review, but require a substantial implementation effort.
The meeting will take place on Monday 2025/05/05 at 8pm UTC (5:30am Adelaide time) on Libera Chat IRC #lightning-dev. It is open to the public.
A video link is available for higher bandwidth communication: https://meet.jit.si/Lightning-Spec-Meeting
Recently Updated Proposals / Seeking Review
This section contains changes that have been opened or updated recently and need feedback from the meeting participants.
commit_sigretransmission Do not unnecessarily retransmitcommitment_signedin dual funding #1214tx_init_rbfin v2 establishment #1236Taproot extension-bolt: simple taproot channels (feature 80/81) #995Taproot gossip extension-bolt: taproot gossip (features 70/71/72/73/74/75) #1059Liquidity ads Extensible Liquidity Ads #1153Dynamic Commitments Extension/dynamic commitments #11170-fee commitments Zero-fee commitments using v3 transactions (feature 40/41) #1228Stale Proposals
This section contains pending changes that may not need feedback from the meeting participants, unless someone explicitly asks for it during the meeting. These changes are usually waiting for implementation work to happen to drive more feedback.
Clarify Bolt 11 invoice requirements Clarify Mandatory Field Length Requirements and Add Note on Low R Signatures in BOLT 11 #1243Inbound fees Inbound routing fees blips#18 and Add a bLIP for backwards-compatible inbound fees blips#22Waiting for interop
This section contains changes that have been conceptually ACKed and are waiting for at least two implementations to fully interoperate.
They most likely don't need to be covered during the meeting, unless someone asks for updates.
option_channel_typeAssumeoption_channel_type#1232option_zero_reserve(FEATURE 64/65) #1140 (follow-up on bolt2: relax channel_reserve_satoshis requirements #1133 to include a feature bit)Don't force close until error is received afterchannel_reestablishNodes shouldn't publish their commitment when receiving outdatedchannel_reestablish#934Long Term Updates
This section contains long-term changes that need review, but require a substantial implementation effort.
Simplified commitment Feature 106/107: option_simplified_update. #867lnprototest (https://github.com/rustyrussell/lnprototest)