Skip to content

Advance merged foundation capability truth states #267

Description

@levineam

Goal

After PR #257 merged, update the capability ledger and its regression fixtures from draft-PR state to the truthful merged-repository state.

Done criteria

  • Ledger no longer points at pull/257 as draft evidence.
  • Specification/repository states match the documented truth-state vocabulary and the merged commit 03b5263e3b273ea7a3e76581fd73c6059fd90ada.
  • Verification/activation/authority remain conservative; merge does not imply live activation.
  • Focused/full tests and independent review pass.

No runtime, install, process, credential, Vault, or activation changes. Coordination: levineam/clawd#1249.

Activity

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    No labels
    No labels

    Projects

    No projects

      Milestone

      No milestone

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions