Owner: P3 (capture) + P4 (script). Coordinator: Jon.
Acceptance: Sun 1100-1200 window — capture, edit, upload, link.
Recording infrastructure is ready (PR #87, #89, #76, #78). 7 component clips
live in docs/demo-clips/. The 1-minute pitch cut still needs to:
Source: TASKS.md #25.
Owner: P3 (capture) + P4 (script). Coordinator: Jon.
Acceptance: Sun 1100-1200 window — capture, edit, upload, link.
Recording infrastructure is ready (PR #87, #89, #76, #78). 7 component clips
live in docs/demo-clips/. The 1-minute pitch cut still needs to:
Source: TASKS.md #25.