Skip to content

T19-01 Phase 3: Transport and receipt integration #557

Description

@edithatogo

Track phase issue governed by the T19-01 Conductor plan.

Parent track: #550
Parent phase: #554
Plan: conductor/tracks/T19-01/plan.md

Implementation is not authorized by planning-only track creation.

  • Add stored draft_body/published body round-trip inspection.
  • Extend create/update receipts without changing existing confirmation semantics.
  • Add CLI diagnostics and machine-readable remediation options.
  • Verify backwards compatibility and consumer-driven contracts.
  • Phase Verification & Checkpoint (see conductor/workflow.md).

Activity

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    conductorOwned by a Conductor track or taskconductor-taskConductor programme task or plan-phase issue

    Projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions