There are some notes in the inspector repository on the input to the summarizer at https://github.com/clamsproject/mmif-inspector/blob/main/docs/developer-notes.md.
Since that repository is not about the summarizer anymore I want to move them and I am collecting candidates for landing spots. I see two candidates in this repository:
- a new docs directory inside the summarizer package
- the mmif-python documentation.
Any other candidates?
There are some notes in the inspector repository on the input to the summarizer at https://github.com/clamsproject/mmif-inspector/blob/main/docs/developer-notes.md.
Since that repository is not about the summarizer anymore I want to move them and I am collecting candidates for landing spots. I see two candidates in this repository:
Any other candidates?