- The calculator combines estimates from sources with different methods and system boundaries.
- Summary and document-analysis values are classroom comparison estimates, not measured averages.
- Infrastructure scenario values for Scenarios 2 and 3 are illustrative estimates; see ⚠️ notes above.
-
-
-
How infrastructure changes the picture
@@ -892,6 +844,54 @@
What makes the difference?
Actual impact varies by model, response length, hardware, location, cooling system, and electricity source.
The rewrite, summary, and document-analysis presets use classroom comparison values anchored to the published typical text-query estimate.
+
+
+
Data sources
+
These studies provide the published reference values used in this calculator.
+ The calculator combines estimates from sources with different methods and system boundaries.
+ Summary and document-analysis values are classroom comparison estimates, not measured averages.
+ Infrastructure scenario values for Scenarios 2 and 3 are illustrative estimates; see ⚠️ notes above.
+