You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
Execution tracking (epic) for the deterministic-substrate roadmap (ADR-093: intent lives in the corpus, execution here).
Intent (corpus):rac/roadmaps/deterministic-substrate.md — the council-ranked programme advancing rac-core as the deterministic knowledge layer underneath AI coding agents. The scoring method, averages, and the review constraints (recorded as Risks) live in the artifact.
Tracking model: each item first graduates from rac/roadmaps/future/ into its own scoped roadmap (intent captured), then gets its own execution epic when it is taken into build. Until an item is scheduled for build it is tracked as a checkbox here and its roadmap's ## Related Tickets bridges to this epic — a graduated-but-unscheduled item is tracked, not missing an epic.
artifact-family-factory — family-creation contract proven on the built-in Risk pilot — graduated to its own scoped roadmap (rac/roadmaps/artifact-family-factory.md, Planned); unscheduled, tracked here until taken into build
Third-party artifact types (ADR-083) — entry-point registry: inert seam first, discovery + generic validation second, the hardcoded OKF type map closed in the same acceptance; public invitation stays behind GATE-2
Deferred until their stated triggers:
lore-at-team-scale — the 50+ developer signal; mandatory audit-on and cache-coherency guarantees are entry conditions — trigger met (organisation-scale rollout) and delivered across all four initiatives (epic Epic: lore-at-team-scale — shared serving at organisation scale #262; HTTP transport ADR-098, derived-index cache ADR-099, shared-server audit identity)
Tranche A status: cleared — all four items delivered, save the fenced later-phases of freshness-and-drift-detection. Tranche B's retrieval-diagnostics is now in build (#314); the next unscheduled items are Tranche C's artifact-family-factory and the ADR-083 entry-point registry.
Ordering and task state live here; the roadmap remains the durable record of what and why.
Execution tracking (epic) for the
deterministic-substrateroadmap (ADR-093: intent lives in the corpus, execution here).Intent (corpus):
rac/roadmaps/deterministic-substrate.md— the council-ranked programme advancing rac-core as the deterministic knowledge layer underneath AI coding agents. The scoring method, averages, and the review constraints (recorded as Risks) live in the artifact.Tracking model: each item first graduates from
rac/roadmaps/future/into its own scoped roadmap (intent captured), then gets its own execution epic when it is taken into build. Until an item is scheduled for build it is tracked as a checkbox here and its roadmap's## Related Ticketsbridges to this epic — a graduated-but-unscheduled item is tracked, not missing an epic.Tranche A — core differentiators and free wins:
decision-to-code-proximity— declared code-scope references + deterministic path→decisions lookup (CLI + MCP); precondition for the drift gate — delivered (epic Epic: decision-to-code-proximity — decisions at the point of edit #273, closed; PRs feat(relationships): add decision code-scope Applies To vocabulary [roadmap:decision-to-code-proximity] #284/feat(resolve): add path-to-decisions lookup over CLI and MCP [roadmap:decision-to-code-proximity] #285/feat(explorer): surface decisions governing a code path [roadmap:decision-to-code-proximity] #286; also closed traceability gap 7 on Epic: relationship-vocabulary — close the traceability gaps #236)freshness-and-drift-detection(phase 1) — git-derived staleness fields + advisory drift finding in doctor/review — phase 1 delivered (PRs freshness-and-drift-detection: read surfaces — surface git-derived staleness on find/search and MCP results #278/freshness-and-drift-detection: drift finding — advisory suspect-artifact finding in doctor/review #279 merged). The later-phase CI-gate form and freshness-biased retrieval remain fenced and unscheduled (no requirement minted yet; each needs its own decision), tracked in Epic: freshness-and-drift-detection — loud staleness and suspect links (phase 1) #277integration-recipe-factory— harness recipe + first verified examples (zero engine diff) — delivered across all three initiatives (PRs docs(recipes): integration recipe factory + first three harness recipes #309/docs(recipes): harness backlog + opencode recipe #310): the recipe authoring template + contract, the verification gate, and the prioritised harness backlog, proven with four recipes (Zed, Windsurf, Cline, opencode); roadmap Achieved (docs(roadmap): mark Tranche A roadmaps Achieved (housekeeping) #313)lean-context-delivery— measured, regression-checked MCP context footprint; CLI-first documented — delivered across all three initiatives (PR feat(mcp): lean-context-delivery — measured surface budget, selective retrieval, CLI-first path #311): the measured MCP surface budget (~915 tokens under a 1000 budget), the selective-retrieval guarantee, and the CLI-first delivery docs; roadmap Achieved (docs(roadmap): mark Tranche A roadmaps Achieved (housekeeping) #313)Tranche B — reach:
retrieval-diagnostics— explain-miss + floor-ratio bounded-boost gate, golden-pinned — taken into build (epic Epic: retrieval-diagnostics — explain-miss and the floor-ratio boost gate #314, sub-issues retrieval-diagnostics: explain-miss — deterministic "why not X" trace #315/retrieval-diagnostics: floor-ratio boost gate — the bounded-boost invariant as a tested gate #316), scheduled for the July release train (2026.07.3–2026.07.4)corpus-export-to-rag-backends— shipped (v0.25.0 projections, ADR-074;rac-connectorscompanion, ADR-095, incl. self-hostable neo4j); residual docs deliverable absorbed into Epic: corpus-sync — the versioned consumption plane #255/corpus-sync: export contract schemas — publish and CI-validate the three projections #256; artifact Achieved. The consumption-plane evolution continues as thecorpus-syncprogramme (Epic: corpus-sync — the versioned consumption plane #255)Tranche C — extensibility, in order:
artifact-family-factory— family-creation contract proven on the built-in Risk pilot — graduated to its own scoped roadmap (rac/roadmaps/artifact-family-factory.md, Planned); unscheduled, tracked here until taken into buildDeferred until their stated triggers:
— trigger met (organisation-scale rollout) and delivered across all four initiatives (epic Epic: lore-at-team-scale — shared serving at organisation scale #262; HTTP transport ADR-098, derived-index cache ADR-099, shared-server audit identity)lore-at-team-scale— the 50+ developer signal; mandatory audit-on and cache-coherency guarantees are entry conditionsskill-trust-and-surfacing— third-party skills becoming real (still deferred;rac/roadmaps/future/skill-trust-and-surfacing.md, Planned)Tranche A status: cleared — all four items delivered, save the fenced later-phases of
freshness-and-drift-detection. Tranche B'sretrieval-diagnosticsis now in build (#314); the next unscheduled items are Tranche C'sartifact-family-factoryand the ADR-083 entry-point registry.Ordering and task state live here; the roadmap remains the durable record of what and why.