Skip to content

[VSJoin-Exec] Mechanism III gap closure: predictable skew control plane #132

Description

@ZeroJustMe

Theme

Mechanism III: Predictable Control Plane for Skew

Problem to close

Writeup may overstate optimality while implementation is heuristic and periodic; need explicit code-faithful contract.

Implementation Tasks

  • Verify/complete RCU-style AssignmentTable publication semantics:
    • lock-free reads
    • batched writes
    • atomic publish
  • Finalize LoadMonitor sampled signals (cumulative + smoothed).
  • Finalize rebalance controls:
    • trigger thresholds
    • per-round migration cap
    • cooldown/period
  • Keep foreground path free of synchronous full-state migration.

Validation

  • Test atomic remap visibility (no partial publish exposure).
  • Skew workload tests: before/after imbalance indicators.
  • Stress rebalance churn bounds under frequent skew changes.

Paper Follow-up (Ch3/Ch4/Ch5)

  • Ch3: claim predictability, not global-optimal balancing.
  • Ch4: publish semantics + heuristic trigger + migration cap.
  • Ch5: skew mitigation proposition and boundary statement.

Acceptance Criteria

  • Control-plane claims are strictly bounded to implemented heuristics.

Metadata

Metadata

Assignees

No one assigned

    Labels

    No labels
    No labels

    Type

    No type

    Projects

    No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions