Skip to content

Latest commit

 

History

History
26 lines (18 loc) · 861 Bytes

File metadata and controls

26 lines (18 loc) · 861 Bytes

ndarray — Progress Tracker

Tracks progress against the master integration plan plateaus. See /home/user/INTEGRATION_PLAN.md for full context.

Plateau 0: Everything Compiles

  • P0.1: Fix exit-101 build failure
  • P0.2: Fix 2 doctest failures:
    • crystal_encoder.rs line 251 (distill doctest, compile error)
    • udf_kernels.rs line 200 (sigma_classify assertion: "noise" != "exact")
  • 880 lib tests passing (when build succeeds)
  • All 55 HPC modules ported from rustynum

Plateau 1: Doc Updates

  • 1C.6: Update prompts 04/05 with lance-graph status — DONE (2026-03-22)

Plateau 2: Consumer Migration Support

  • Provide stable Fingerprint<256> API for ladybug-rs migration
  • Provide BF16Truth API for ladybug-rs NARS migration
  • Provide plane_to_base17() for lance-graph Phase 3

Last updated: 2026-03-22